| Metric | Q1'26 | Q2'26 | Change |
|---|---|---|---|
| Revenue | $37M, -23% YoY | $30M vs $61M YoY, -51% | Revenue decline accelerated sharply, -23% to -51% YoY |
| Operating income/(loss) | -$98M incl. $28M D&A | -$141M incl. $63M accelerated D&A | Loss widened 44% driven by one-time rig shutdown charge |
| Loss from continuing operations | -$128M / -$0.21 EPS | -$64M / -$0.11 EPS | Sequential loss narrowed, but prior-year comp was +$13M income |
| Adjusted EBITDA | -$17M | -$24M | Deteriorated sequentially despite revenue mix shift |
| Cash SG&A run-rate | Guided ~$100M/year, $25M/qtr | Tracking $100M/year, $23M/qtr avg H1 | In-line with guide, no surprise |
| Total liquidity | $533M as of May 8 | $819M as of Aug 7 | +54%, but entirely financing-driven, not organic |
| Bitcoin sold (proceeds) | 269 BTC for $20M (Jan-May) | 1,085 BTC for $75M (Apr-Aug) | Liquidation pace 4x accelerated |
| BTC fair value change | -$41M loss | -$20M loss vs +$32M gain YoY | Smaller loss sequentially but still a swing from prior-year gain |
| Leases signed (of 2026 target of 3) | Target: 3 by year-end | 0 signed; target not reaffirmed | No progress, and management avoided restating the numeric commitment |
| Moses Lake expansion option | 10MW option 'secured,' low-friction | Option abandoned, capped at 18MW | Optionality destroyed, not exercised |
Get free previews of our earnings-call research: the key changes, management scores, and questions worth investigating. Subscribe for full call sheets and deeper analysis.
Subscriptions are managed by Substack. If the form does not load, subscribe directly. Or follow the RSS feed.