10/12
Disclosure score
3 medium, 3 low flags
Financial quality
Bottom line
The sleeper story is this isn't a wind company - it's a data center infrastructure play generating $15B in regulated investment returns while CVOW grabs headlines. The obvious narrative is clean energy transition, but the real money is in 47 GW of contracted demand driving 10% rate base growth through transmission and distribution capex. The binding constraint is financing capacity: management pushed growth acceleration to 2028 despite higher capex because 'equity dilution' and 'financing costs' don't support earlier acceleration. Blue's most revealing quote: 'We are deliberately moving more slowly' on CVOW turbines after installing just 1 in 6 weeks - execution risk is real. My view changes if CVOW turbine installation accelerates meaningfully above current pace or if they can achieve 6%+ growth without the projected equity dilution.

The 30-second version

  • The sleeper story: Data center revenue already exceeds wind revenue by 5x but management buried this in transmission capex
  • CVOW turbine installation disaster masked by 'learning curve' spin
  • Management quietly downgraded long-term growth confidence from 6% to 'upper half of 5-7% range starting in 2028'

What changed this quarter

MetricQ3'25Q4'25Change
Operating EPS$2.27 (Q3 2025)$3.42 (+$0.12 vs midpoint guidance)+51% quarterly jump, beat midpoint
Weather Impact-$0.06 worse than normalNormal weather assumed for guidance+6¢ tailwind reversal
Data Center Pipeline~47 GW in contracting48+ GW in contracting+1.4 GW or 3% growth in one quarter
Five-Year Capex Plan$50B through 2029$65B through 2030+30% increase, $15B additional
CVOW Project Cost$11.2B with $206M contingency$11.5B with $155M contingency+$300M cost increase, -$51M contingency burn
CVOW Turbines Installed0 turbines1 turbine (175 remaining)Installed first turbine in January but damaged blade
Virginia Weather-Normal SalesGrowing at data center pace+5.4% growth in 2025Accelerating demand, top 20 peak days in 14 months
RNG 45Z Credits$0.10 per share expected 2026+$0.07 per share midpoint 2026-30% reduction due to worse CI scores
Long-term EPS Growth6% average through 5-year planUpper half of 5-7% starting 2028Pushed growth acceleration out 3 years
Rate Base CAGRNot specified~10% compounded annual growthNew disclosure of double-digit rate base growth

Accountability tracked

7 new promises made4 narrative shifts flagged6 prior promises scored
Inside the full report
The complete write-up covers the full promise ledger with kept/missed calls, disclosure-quality scoring, the metrics-vanished check, verification items, and the questions to ask next quarter.
Read the full D Q4'25 report Subscribe
This is a free preview. The full write-up and promise ledger are published to subscribers on Substack.
Scores, kept-promise rates, and flags on this site reflect the author's opinion, applying a stated methodology to statements management made on public earnings calls. Informational and educational purposes only - not investment advice, a recommendation, or an offer to buy or sell any security. Sources believed reliable but not guaranteed; the author may hold positions in the securities discussed.

Follow what management promises next

Get free previews of our earnings-call research: the key changes, management scores, and questions worth investigating. Subscribe for full call sheets and deeper analysis.

Subscriptions are managed by Substack. If the form does not load, subscribe directly. Or follow the RSS feed.