| Metric | Q4'25 | Q1'26 | Change |
|---|---|---|---|
| Oil Production | ~515k bopd Q4 2025 | ~520k bopd Q1 2026 | Modest beat with new guidance of 520k+ suggesting acceleration |
| Reinvestment Rate | 44% planned | 34% at current strip | 1,000 bps improvement in capital efficiency |
| Completed Lateral Feet | 6.0M planned | 6.2M revised up | 200k feet increase (+3.3%) for back-half acceleration |
| Average Lateral Length | 12.9k feet target | 11.5k feet Q1 actual | Q1 was light quarter, ramping to 12.9k full year |
| DUC Count | ~200 target | Peaked 200+ in Q1 | Will draw Q2 then rebuild with new rigs |
| Waha Gas Pricing | Challenging | Negative $3 to negative $6 | Severely negative, forcing 2-3k bopd shut-ins |
| Well Performance | Productivity questioned | Up vs 2024 | Surprising outperformance on per-foot basis |
| Drilling Efficiency | $360/foot Wolfcamp D | $300/foot achieved | 17% cost reduction ahead of target |
| Completion Efficiency | 4,500 feet/day | 5,500+ feet/day peak | 22%+ improvement with continuous pumping |
| Net Debt Target | $10B in 12-18 months | Could hit in couple months | Massive acceleration due to commodity prices |
Get free previews of our earnings-call research: the key changes, management scores, and questions worth investigating. Subscribe for full call sheets and deeper analysis.
Subscriptions are managed by Substack. If the form does not load, subscribe directly. Or follow the RSS feed.