| Metric | Q4'25 | Q1'26 | Change |
|---|---|---|---|
| Adjusted EPS | $0.92 (Q1 2025) | $0.91 (Q1 2026) | -1 cent YoY decline |
| 4-Year CapEx Plan | $41.3B (Q4 2025) | $41.7B (Q1 2026) | +$400M but net reshuffling |
| Distribution CapEx Reduction | Not disclosed | $1.1B of deferrals/reductions | Material pullback from grid investment |
| Transmission CapEx Addition | Not disclosed | +$1.5B incremental | Offsetting distribution cuts |
| Rate Base Growth Target | 7.9% (Q4 2025) | 7.9% maintained | Unchanged despite CapEx reshuffling |
| Transmission Rate Base Growth | 15% (Q4 2025) | 16% through 2029 | +100bps acceleration |
| O&M Growth Target | 2.5% through 2029 | 2% through 2029 | -50bps tighter cost control |
| 2027 O&M Savings | Not disclosed | $350M incremental | New cost reduction commitment |
| ComEd Timing Impact | Not disclosed | -$0.04 revenue shaping | Q1 headwind from 2025 pull-forward |
| Interest Expense | Not disclosed | +$0.02 higher at Corporate/PICO | Rising financing costs hitting |
Get free previews of our earnings-call research: the key changes, management scores, and questions worth investigating. Subscribe for full call sheets and deeper analysis.
Subscriptions are managed by Substack. If the form does not load, subscribe directly. Or follow the RSS feed.