| Quarter | Call date | Disclosure | Financial quality | Kept | Missed | |
|---|---|---|---|---|---|---|
| Q3'26 | November 12, 2026 | 9/12 | 4 medium, 4 low flags | 1 | 1 | Call sheet → |
| Marked | Status | Promise |
|---|---|---|
| Q3'26 | Pending | Battery storage expected to contribute $25M-$27M to consolidated adjusted EBITDA in 2027 Reaffirmed at the same $25M-$27M range this quarter; no change in magnitude, still a 2027 event. |
| Q3'26 | Missed | Expectation that Q4 self-procurement of fuel would decline because producers would not easily break CAMMESA contracts to sign directly with generators Management itself announced the opposite: a direct Pluspetrol supply deal withdrawing volumes from the CAMMESA pool as of October 1, directly contradicting the stated difficulty of such arrangements. |
| Q3'26 | Exceeded | Self-procurement ramp projected to reach only about a third to 40% of fuel consumption, with full natural gas self-sufficiency only near 2028 Self-procured fuel already hit 55.3% of total fuel consumption in Q3 2026, materially ahead of the stated ramp. |
| Q3'26 | Pending | Battery storage projects expected to be energized October-November with commercial operation in Q4 2026 Construction is now at 81%/87% complete with 82% of CapEx executed, tracking toward the stated window, but actual commercial operation was not confirmed as achieved on this call. Actual not stated on the call. |
Get free previews of our earnings-call research: the key changes, management scores, and questions worth investigating. Subscribe for full call sheets and deeper analysis.
Subscriptions are managed by Substack. If the form does not load, subscribe directly. Or follow the RSS feed.